Development Potential Assessment for Proposed Agra Ring Road Development, Agra
Name of Client:Archohm Consults Pvt. Ltd
In this project, BOV covers all the aspects related to Development potential in different categories of Real estate, Typology Mix (commercial, retail, residential, Institutional), Product Mix (details of each typology), Product size, Sale Price, Disposal Methodology and Overall revenue and financial numbers (IRR and ROI).
Development Potential Assessment for Padam Pride, Agra
Name of Client:Shri Riddhi Siddhi Buildwell Pvt. Ltd
BOV worked on development potential assessment, Valuation and also suggesting traditional & alternate financing mechanisms in Padam Pride, Agra.
Development Potential Assessment for Proposed LDA Development on AvadhVihar, Lucknow
Name of Client:Archohm Consults Pvt. Ltd
BOV role was to do financial advisory for integrated housing project and exploring alternate and traditional Financing mode in the Avadh Vihar, Lucknow.
Feasibility study of Ambience Mall, Gurugram
Project Size: -150 Acre(Built up area – 1.9 Million sq. ft.)
Name of Client:Ambience developers
The role of BOV is to educate the developer on Retail Real Estate and to carry out feasibility study, suggest product mix and zoning. BOV also plays an important role on aiding the developer in designing of the mall and introduction of an office tower at the site.
Feasibility Study of Kuthar, Near Kasauli, Himachal Pradesh
Project Size: 60 acres
Name of Client: Solutrean Building Technologies Ltd
BOV created a phased project with limited equity requirement in the initial stages.Initial phases were tourism centric which are comparatively easier to get approved, later phases were geared towards the second home market.Separate phase for senior citizen was planned so that they can spend their retired days in the surroundings of Kasauli.
Demand Forecast, TOD Policy, Gurugram
Region of Influence: 53 Km Right of Way of proposed MRTS Corridors in Gurgaon
Name of Client: Piramal Fund ManagementPvt Ltd
BOV helped Piramal in assessing the supply risk to their existing investments and gave Piramal a deep insight into the realty market allowing them to identify developers for future investments. The results of the study clearly established that only a fraction of the land falling in the TOD zone could realistically benefit from TOD Policy.
Development Potential Assessment for Proposed LDA Development ChakGanjaria, Lucknow
Project Size: 846 acres
Name of Client: Archohm Consults Pvt. Ltd
BOV went through an iterative process with the project master planners in order to arrive at a master-plan that demonstrates synergy in urban design and real estate. BOV forecasted the revenue from the project so that Lucknow Development Authority can anticipate future cash flow from the project, part of the funds were used to develop Lucknow Metro and the pricing laid down by BOV was form the basis when determining the reserve price for auction of land.
Financial Consultancy & Transaction Advisory services for Hinjewadi Shivajinagar Pune Metro Rail Project for Pune Metropolitan Region Development Authority
Project Size:- 5.63 acres
Name of Client: -Industrial Finance Corporation of India (IFCI)
In these project, BOV worked as a consultants for Preparation of Feasibility Reports for Construction on the Land and provide with 3 most suitable options of Constructions on the land. BOV also conduct a detail assessment of market potential of the real estate component in the Project and carry out a study of the pricing profile for real estate sectors in the city. BOV also carry out the best use identification study for the project based on the demand and supply analysis and recommend the development or product mix for the project to maximize revenue realizations.
Case study of Market analysis, financial analysis, Design development for Real estate development and management at Stapelton, Denver, USA
Project Size :-Denver city (401.4 km²)
Name of Client: – RICS Executive Education, London, U.K.
In 1985 the City of Denver proposed the development of a new airport that is now called Denver International Airport (DIA). Stapleton Airport was shut down in 1995 and the city was left with this large piece of Brownfield Real Estate occupying an area of 4,700 acres. To put that into perspective it is a third of the land area of Manhattan. The major challenge in the project is to decide the phasing and land use as per market demand. To decide this it is important to understand the real estate market at the regional and local level. The main role of BOV in these project was to study for Land development, Alternate Financing, Project Management and facility Management of Stapelton, Denver, USA.